Previous Page  5 / 148 Next Page
Information
Show Menu
Previous Page 5 / 148 Next Page
Page Background

In the fall of 2014, Virginia Tech invested in a new, sophisticated

sound system for the arena. The programmable system, combined

with the video boards installed in 2013, provides an exciting feature

at games. Later that season, an enhanced LED lighting system was

installed in Cassell Coliseum. The lighting allows instant on-and-

off control, zoned lighting and will be adaptable to allowing unique

lighting for specific needs and events.

The team was given a gift from Pat and Sandy Cupp of Blacksburg,

Va., to renovate the men’s basketball locker room, which is now

the Bill Foster Basketball Suite, named after one of Tech’s most

successful men’s basketball coaches. Even with the addition of the

Hahn Hurst Basketball Practice Center, the Bill Foster Basketball

Suite remains the game-day locker room for the Hokies.

Entering the 2016-17 season, the Hokies have won 561 out of 749

games played in Cassell, for a winning percentage of .749.

The first basketball game played in the Coliseum was on January

3, 1962, as the Hokies routed Alabama, 91-67. The near-capacity

crowd had to sit on the concrete floor to watch the initiation of the

new building because the seats had not arrived. In-state rivals have

had little success playing the Hokies in Cassell, winning only 17 of

135 visits. Although capacity crowds are a frequent occurrence in

Cassell Coliseum, the largest crowd ever recorded was an overflow

of 11,500 for Purdue on December 3, 1966.

On September 17, 1977, Virginia Tech officials and friends dedicated

the Coliseum in honor of the late Stuart K. Cassell.

Beginning with last season, there was a new look to Cassell Coliseum,

as the Virginia Tech Department of Athletics unveiled “Courtside at

Cassell”. This allows Hokie fans the opportunity to enjoy premium

courtside seating at Cassell Coliseum. Courtside at Cassell consists

of 14 brand new four-seat tables which line the court across from the

team benches and along the baseline.

Prior to the 1988-89 season, a modern, spring-loaded playing floor

was installed in the Coliseum. During the fall of 1989, the facility was

upgraded with an improved lighting system in the arena.

1 6 - 1 7 M E D I A G U I D E

#getB3 TTER #ThisIsHome

3